THE BRIEFUK Building Compliance recently conducted Air Pressure Testing at a New Build propertyTHE PROCESSAfter reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedure, all calibrated equipment was setup to ensure the most accurate result possible THE RESULTsAIR TESTING RESULTS≤ 10.0 m³.h.m² @ 50paTarget3.45ResultPASSCompliantThe plot achieved
Recent Projects
