Recent Projects

THE BRIEFWe completed a SAP Assessment, Water Efficiency Calculations and Building Testing for this property in WellsboroughThe Building Testing included New Build Air Testing and Part F Ventilation Testing THE PROCESSFurther to reviewing drawings, on site testing was ready to be completedOur ATTMA registered engineers carried our Air Tighntess Testing following strict procedures, with BSRIA calibrated equipment to

Read More
SAP Assessment, Water Usage Calculations, Air Tightness Testing & Ventilation Testing – Wellsborough

Recent Projects

THE BRIEFUK Building Compliance completed SAP Calculations, Water Usage Calculations and a Net Zero Statement for this client in Watford. This was required to assist the projects planning application by helping to meet Paragraph 80 of the National Policy Framework.  This allows local authority’s to grant planning permission on isolated homes in the countryside by proving

Read More
Net Zero Statement, SAP Calculations & Water Usage Calculations in Watford

Recent Projects

THE BRIEFA combined package was completed by UK Building Compliance for our client  Ventilation Testing, Air Tightness Testing, Sound Insulation Testing & SAP Reports were completed THE PROCESSFurther to reviewing drawings, on site testing was ready to be completed. our strict Air Tightness Testing procedures were adhered to, all calibrated equipment was setup to ensure the most

Read More
SAP Report, Air Pressure, Sound Insulation & Ventilation Testing in Coventry

Advice

what is PAS 2035?PAS 2035: 2019 HAS BEEN DEVELOPED AS A FRAMEWORK DOCUMENT AIMED AT GUIDING THE ENERGY RETROFIT OF DOMESTIC BUILDINGS IN THE UK. It WAS ESTABLISHED TO PROVIDE BEST PRACTICE FOR THE ENERGY RETROFIT PROCESS – AS PART OF THE ‘EACH HOME COUNTS’ PROCESS IN CONJUNCTION with TrustMark.How WE CAN HELP:Air Tightness Testing – Although

Read More
What is PAS 2035?

Recent Projects

THE BRIEFUK Building Compliance completed an Air Pressure Test on this property THE PROCESSFurther to looking at the drawings, we tested this property in accordance with our strict air tightness testing proceduresAll calibrated equipment was setup to ensure the most accurate result possible was achieved THE RESULTsAIR TESTING RESULTS≤ 5.00 m³.h.m² @ 50paTarget4.86ResultPASSCompliantAir Tightness levels were in

Read More
Air Tightness Test in Machynlleth