Air Tightness Testing in Whitchurch

THE BRIEF

THE PROCESS

  • Following on from reviewing drawings, we tested this property in accordance with strict air tightness testing procedures
  • All calibrated equipment was setup to ensure the most accurate result possible was achieved

THE RESULTs

  • AIR TESTING RESULTS

≤ 5.00 m³.h.m² @ 50pa

Target

4.96

Result

PASS

  • Compliant

Please refer to our Myth Busters for SAP Calculations here, Myth Busters for Air Tightness Testing here and for common misconceptions and How To Guides in our Advice Centre here