THE BRIEFWe were asked to conduct an Air Pressure Test on this property in Wootton WawenTHE PROCESSFollowing on from reviewing drawings, we tested this property in accordance with strict air tightness testing proceduresAll calibrated equipment was setup to ensure the most accurate result possible was achieved THE RESULTsAIR TESTING RESULTS≤ 5.00 m³.h.m² @ 50paTarget4.05ResultPASSCompliantAir Tightness levels
Recent Projects
