Recent Projects

THE BRIEFUK Building Compliance were appointed to undertake an Energy & Sustainability Statement  to support a planning application in Leicester, followed by design stage SAP calculationsLocated in Leicester; this was for a proposed conversion of a factory into domestic units.THE PROCESSOur expert team outlined multiple options in order to meet the planning requirements with flexibility.

Read More
L1B SAP Calculations, Energy Statement & TM59 Assessment in Leicester

Recent Projects

THE BRIEFUK Building Compliance were appointed to undertake Air Tightness Testing and Sound Insulation Testing at a new build property in Bradford, YorkshireThe Sound Tests were Airborne Wall testsTo pass an Airborne test for conversion properties you must score 43db or higher Airborne tests measure the difference in sound levels between the receiver room and neighbouring walls

Read More
Air/Sound Testing in Yorkshire

Recent Projects

THE BRIEFUK Building Compliance was instructed to undertake SAP Calculations, Water Efficiency Calculations, Background Ventilation Calculations and a TM59 Assessment on a new build dwelling near High Wycombe.THE PROCESSOnce the drawings had been reviewed, we proceeded with the on-site testing.In accordance with our rigorous air tightness and building sound testing protocols, all calibrated equipment was

Read More
Full Design Stage Package in High Wycombe

Advice

Since its introduction in 2022, the Approved Document Part O has become an important aspect of the Building Regulations for newly constructed domestic properties. Simplified Method The default route to complianceLooks only at floor area, orientation, glazing area & openable area of glazingDemonstrates a simple pass or failCannot factor in mitigationsDynamic Thermal Model (CIBSE TM59)Alternative, more

Read More
Part O – Dynamic Thermal Model versus Simplified Method

Advice

As building regulations continue to evolve, ensuring optimal air quality and energy efficiency has never been more important. Mechanical Ventilation Commissioning (often referred to as Ventilation Testing) plays a key role in meeting Building Regulation Part F compliance, confirming that ventilation systems are performing effectively and delivering the intended air flow rates.At UK Building Compliance,

Read More
Understanding Mechanical Ventilation Commissioning: What You Need to Know