THE BRIEF

Air Pressure Test in Kent (plus SAP)

THE PROCESS

  • After reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedures, all calibrated equipment was setup to ensure the most accurate result possible
  • Our consultants guided the client to ensure compliance was met, with the following recommendations:
  • Air Source Heat Pump and MVHR System

THE RESULTs

  • AIR TESTING RESULTS

≤ 5.00 m³.h.m² @ 50pa

Target

  • SAP CALCULATION RESULTS

≤ 22.23

Target Emission Rate (TER)

≤ 57.1

Target Fabric Energy Efficiency (TFEE)

4.65

Result

14.28

Dwelling Emission Rate (DER)

50.3

Dwelling Fabric Energy Efficiency (DFEE)

PASS

PASS

PASS

  • Compliant
  • A 36% reduction on top of the baseline Part L DER was achieved and the DFEE achieved well below the requirement in order to meet the TFEE   
  • The predicted EPC scored an Energy Rating of B, meaning the building would be highly energy efficient
  • Furthermore, our Combined Certification & Testing package offers excellent value   

Please refer to our Myth Busters for SAP Calculations here, Myth Busters for Air Tightness Testing here for common misconceptions and our How To Guides in our Advice Centre here

Start Using UK Building Compliance Today


You may also like

January 25, 2024

July 12, 2022

June 27, 2022

June 23, 2022

May 17, 2022

May 12, 2022

Start Using UK Building Compliance Today