Section 6 SAP Calculations – Glasgow, Scotland

THE BRIEF

Section 6 SAP Calculations - Glasgow, Scotland

THE PROCESS

  • Compliance was achieved via:
  • 6.75kWp Solar PV system
  • Very Low U-Values
  • Low Air Permeability
  • A low Thermal Mass (thanks to a timber frame construction)

THE RESULTs

  • SITE WIDE SAP RESULTS

≤ 26.46

Average Target Emission Rate (TER)

25.82

Average Dwelling Emission Rate (DER)

PASS

  • Compliant
  • The DER achieved well below the requirement in order to meet the TER  