Full Design Stage Package in High Wycombe

THE BRIEF

THE PROCESS

  • Once the drawings had been reviewed, we proceeded with the on-site testing.
  • In accordance with our rigorous air tightness and building sound testing protocols, all calibrated equipment was carefully set up to deliver the most accurate results possible.
  • Our consultants guided the client to ensure compliance was met.

THE RESULTs

TARGET SAP RATING

≤ 7.39 

 Target Emission Rate (TER) (kgC02/yr/m2)

≤ 39.75 

 Target Fabric Energy Efficiency (TFEE) (kWh/m2/yr)

≤ 39.21 

 Total Primary Energy Requirement (TPER) (kWh/m2/yr)

SAP RATING

3.1 

 Dwelling Emission Rate (DER) (kgC02/yr/m2)

39.62

 Dwelling Fabric Energy Efficiency (DFEE) (kWh/m2/yr)

31.91

Dwelling Primary Energy Rate (DFEE) (kWh/m2/yr)

  • Compliant
  • Part O compliant with TM59 mitigations recommended
  • Trickle vents to provide Part F adequate flow rates.   
  • Part G compliant water efficiency of 109.65 Litres per person per day was achieved, the Target being ≤ 125L

Start Using UK Building Compliance Today


You may also like

December 16, 2025

December 15, 2025

May 7, 2024

May 7, 2024

May 7, 2024

May 7, 2024

Start Using UK Building Compliance Today