Complete Package – Planning (Regulation 25A), Design (SAP/Water) & Completion (Air/Vent)

THE BRIEF

Complete Package - Planning (Regulation 25A), Design (SAP/Water) & Completion (Air/Vent)

THE PROCESS

  • We completed a Regulation 25A Report in order to assess the feasibility of various renewable technologies for the project
  • Our assessors assisted with the U-Value Design, Thermal Bridging and the Heating Design
  •  Requirements to be met included Part L, Part G and Part F standards
  •  A Site Readiness Checklist and a Common Faults Guide were issued to the client prior to the tests being carried out to ensure the low Air Tightness Target was achievable
Complete Package - Planning (Regulation 25A), Design (SAP/Water) & Completion (Air/Vent)

THE RESULTs

  • AIR TESTING RESULTS

≤ 4 m³.h.m² @ 50pa

Target

  • SAP RESULTS

≤ 17.39

Target Emission Rate (TER)

≤ 63.9

Target Fabric Energy Efficiency (TFEE)

3.9

Result

17.37

Dwelling Emission Rate (DER)

56.4

Dwelling Fabric Energy Efficiency (DFEE)

PASS

PASS

PASS

  • Compliant
  • We achieved a Water Efficiency Rate of 109.94 Litres per person per day, the Target being ≤ 110L   
  • All of the Ventilation tests passed with no problems, which demonstrated that they had efficient ducting and strong ventilation systems   
  • Our Complete Compliance Package offers excellent value   

Start Using UK Building Compliance Today


You may also like

January 25, 2024

July 12, 2022

June 27, 2022

June 23, 2022

May 17, 2022

May 12, 2022

Start Using UK Building Compliance Today