THE BRIEF

THE PROCESS

  • After drawings were reviewed, our ATTMA registered engineer tested this property in accordance with strict
    air tightness testing procedures
  • All calibrated equipment was setup to ensure the most accurate result possible was achieved
  • Ventilation Testing was also carried out to ensure Part F Regulations were met

THE RESULTs

  • AIR TESTING RESULTS

≤ 5.00 m³.h.m² @ 50pa

Target

4.43

Result

PASS

  • Compliant
  • All Ventilation & Air Tightness Tests passed their targets