THE BRIEF
![Air Tightness project Air tightness testing](https://www.ukbuildingcompliance.co.uk/wp-content/uploads/2024/01/Air-Tightness-project.jpg)
THE PROCESS
THE RESULTs
lodge 1:
≤ 8.00 m3.h.m2 @ 50pa
7.16
Result
≤ 26.08
Average Target Emission Rate (TER)
23.57
Average Dwelling Emission Rate (DER)
PASS
PASS
PASS
THE RESULTs
lodge 2:
≤ 8.00 m3.h.m2 @ 50pa
6.72
Result
≤ 26.08
Average Target Emission Rate (TER)
23.3
Average Dwelling Emission Rate (DER)
PASS
PASS
PASS