Getting your final certificates shouldn't be a headache. To help your upcoming projects hand over on time and on budget, our technical team at UK Building Compliance has answered the top questions we get from site managers.
Can people stay inside during the test?
- Yes, but no one can enter or leave during the process.
- The building must remain completely sealed for accurate pressure readings.
Can I tape over the plug sockets?
- No, this violates Part L and ATTMA regulations.
- Only trickle vents and mechanical fans can be taped.
How long does an air test take?
What happens if the building fails the air test?
When is the best time to book the air test?
Do we need access to next door for sound testing?
- Yes, access to the adjoining property is mandatory.
- We must place noise sources on one side and measure from the other.
Do the properties need to be fully completed?
- Structural walls, floors, doors, and double glazing must be fully fitted.
- Do not install carpets, flooring overlays, or white goods yet.
Does the site need to be quiet during the test?
- Yes, strict silence is required to measure background acoustic levels.
- Noisy activities like drilling or groundworks must stop temporarily.
Why juggle multiple contractors? We provide a complete, nationwide support package to help you pass all building regulations under one roof. Book your site testing alongside our core engineering services to save time and money:
- SAP & SBEM Calculations: Energy performance modelling for new dwellings and commercial builds.
- Part O Overheating Assessments: Essential dynamic thermal analysis to meet modern building control standards.
- Water Efficiency Calculations: Part G compliance reports delivered fast.
- Ventilation Testing: Part F checks to ensure safe air flow alongside your air test.

