Select Page

Project: Ventilation Testing Oadby

Ventialtion Test Oadby – Completed: 28/12/2107

Technicians: Cameron Milnes

 

The Brief

We were instructed to complete a Ventilation Test at this property in Oadby, Leicester.  While on site, our technician also carried out the Air Tightness Testing

To carry out a Ventilation Test, our technicians visited the property and measured the litres of air that passed through each vent every second.  The more air that passes through the better performing the vent is.

 

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Results

WC Target

En-Suite Target

Bathroom Target

Kitchen Target

Utility Target

WC Results

En-Suite Result

Bathroom Result

Kitchen Results

Utility Results

PASS

 

PASS

 

PASS

 

PASS

 

PASS

The Outcome

The property passed all 5 aspects and a certificate will be produced and issued.

For more information, or to receive a free quote CONTACT US or read more about Ventilation Testing.