Project: Ventilation Testing Cirencester

Ventilation Testing Cirencester

Completed: 6/05/2019

Technician: Daniel Hall

The Brief

We were instructed to complete Ventilation testing on these new-build houses in Cirencester.

All of the tests passed with flying colours, meaning that their ducting was effective and their ventilation system powerful.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

The Outcome

The buildings passed the Ventilation Tests and as a result, certificates have been issued.