Project: Ventilation Testing Acton

Ventilation Testing Acton

Completed: 03/09/2019

Technician: Cameron Milne

The Brief

We were instructed to complete Ventilation testing on an extension to this primary school in Acton.

A new toilet block had been built as an extension while the students were on their school holidays.

Only the new toilet extracts required testing, each with targets of 6 and above.

All of the tests passed with flying colours, meaning that their ducting was effective and their ventilation system powerful.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Outcome

The buildings passed the Ventilation Tests and as a result, certificates have been issued.