The Brief

We were instructed to complete a Domestic Air Pressure test on this new-build house located in Wombourne. This stylish design was built using SIPS (Structural insulated panels). This is a high performance building system where panels consist of an insulating foam core sandwiched between two structural facings. The result is a building system that is extremely strong and energy efficient.

The required target for the test was 5.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This building passed the Air Pressure Test and as a result, certificates have been issued.