Select Page
Air Pressure Testing Buckingham

Project: Air Pressure Testing Warwick CV34

Air Pressure Testing Warwick CV34

Completed: 31/07/2018

Technicians: Mikey Crampton & Jack Richings

The Brief

We were instructed to complete a Commercial Air Pressure test on a new industrial unit located in Warwick.

The required target for the test was 3.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This building passed the Air Pressure Test and as a result, certificates will be issued shortly.

For more information on what is required to pass an Air tightness test click HERE