Completed: 25/04/2018

Technician: Cameron Milne

The Brief

We were instructed to complete two Domestic Air Pressure tests on this new-build bungalows in Nuneaton. We also carried out two Vent tests.

The required target for the air pressure tests were 10.

Both of the Vent tests passed.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

#31 Target

#32 Target

Result

Result

 

Pass

 

Pass

The Outcome

This building passed the air testing and as a result, certificates will be issued shortly.