Select Page
Air Pressure Testing Buckingham

Project: Air Pressure Testing The Wharf, Nuneaton

Air Pressure Testing The Wharf, Nuneaton

Completed: 16/05/2018

Technician: Mikey Crampton

The Brief

We were instructed to complete a Domestic Air Pressure test on this new-build property in Nuneaton.

As well as this, we also carried out Ventilation Testing, However, only the kitchen passed the Ventilation tests due to the fact that they were not of adequate quality. The site manager was informed of the corrections which needed completing before arranging a re-test.

The required target for the air pressure test was 9.5.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This building passed the Air Pressure Test and as a result, certificates will be issued shortly.

For more information on what is required to pass an Air tightness test click HERE