Air Pressure Testing Buckingham

Project: Air Pressure Testing The Paddock, Burbage

Air Pressure Testing The Paddock, Burbage

Completed: 12/1/2018

Technician: Cameron Milne

The Brief

We were instructed to complete this Domestic Air Pressure test on this building in Burbage.

The required target was 3.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This building passed the air test and the appropriate certificates have been issued.