Project: Air Pressure Testing Stamford

Air Pressure Testing Stamford

Completed: 09/04/2018

Technician: Mikey Crampton

The Brief

We were instructed to complete a Domestic Air Pressure test on this new-build property in Stamford.

The required target for this particular test was 5.

 

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This building passed this test and as a result, certificates will be issued shortly.