Project: Air Pressure Testing South Northwood

Air Pressure Testing South Northwood

Completed: 5/1/2018

Technician: Cameron Milne

The Brief

We were instructed to complete a Domestic Air Pressure test on this new build property in South Northwood.

The required target for the test was 4.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This property passed its air test and the appropriate certificates have been issued.