Project: Air Pressure Testing Solihull

Air Pressure Testing Solihull

Completed: 18/12/2017

Technician: Cameron Milne

The Brief

We were instructed to complete a Domestic Air Pressure on this new build property in Solihull, Birmingham.

The required target for the Air Pressure test is 5 or below.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Failed

The Outcome

Unfortunetly the property failed the Air Tightness Test and will be retested in the new year.  Below are the reasons why the property failed:

  • Skirting boards were not fitted (leaving gaps for excess air to flow)
  • Toilets we not fitted (leaving air holes)
  • The garage door wasn’t fitted but did have a temporary frame.  The actual garage door needs to be fitted so our technicians can measure what the homes air pressure will be for future residence.

For more information on what is required to pass an Air tightness Test click HERE.