Project: Air Pressure Testing Newton Linford

Air Pressure Testing Newton Linford

Completed: 17/1/2018

Technician: Mikey Crampton

The Brief

We were instructed to complete a Domestic Air Pressure test on this beautiful house in Newton Linford.

Along with this, we also carried out a number of vent tests. each of these vent tests failed due to the fans not being of an acceptable standard. As a result of this, we passed on recommendations to the client in order to help to give them the best possible chance of passing these tests next time. They will now take our comments on board and then get in touch regarding a re-test when they are ready.

The required target for the air pressure test was 7.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This building passed the air test and the appropriate certificates have been issued.