Air Pressure Testing Ikley

Project: Air Pressure Testing Ikley

Air Pressure Testing Ikley

Completed: 8/1/2018

Technician: Cameron Milne

The Brief

We were instructed to complete this Commercial Air Pressure test on this new office block in Ikley.

The first time round, this particular test actually failed, so we provided them with a list of things to focus on in order to give them the best chance possible of achieving a pass next time.

The required target was a very high 10.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This building passed the air test on this second attempt and the appropriate certificates have been issued.