Select Page
Air Pressure Testing Buckingham

Project: Air Pressure Testing Exhall

Air Pressure Testing Exhall

Completed: 30/05/2018

Technician: Mikey Crampton

The Brief

We were instructed to complete a Commercial Air Pressure test on this new building in Exhall.

The required target for the air pressure test was 4.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

This building passed the Air Pressure Test and as a result, certificates will be issued shortly.

For more information on what is required to pass an Air tightness test click HERE