The Brief

We were instructed to complete 6 Domestic Air Pressure tests on these new-build houses in Derby. We also carried out 3 Sound Insulation Tests.

The required targets for the air pressure tests was 5.

The details for the Sound Insulation Testing is listed below:

ROOMS TESTED TARGET SCORE RESULT
Plot 5 Living – Plot 6 Living 45/+ 53 Pass
Plot 3 Living – Plot 4 Living 45/+ 51 Pass
Plot 2 Living – Plot 1 Living 45/+ 51 Pass

 

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Plot 1 Target

Plot 2 Target

Plot 3 Target

Plot 4 Target

Plot 5 Target

Plot 6 target

Result

Result

Result

Result

Result

Result

 

Pass

 

Pass

 

Pass

 

Pass

 

Pass

 

Pass

The Outcome

This buildings passed each test and as a result, certificates will be issued shortly.