Air Pressure Testing Cawston

Completed: 17/06/2019

Technician: Cameron Milne & Daniel Hall

The Brief

We were instructed to complete a Domestic Air Pressure test on this new-build house in Cawston.

We also did the sealing of this property which included applying silicon around the floor plan and expanding foam around waste pipes and other service areas.

The required target for the tests were 5.7.

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

 

Target

Result

 

Pass

The Outcome

The building passed the Air Pressure Test and as a result, certificates have been issued.