Air Conditioning Reports

FREE DOWNLOAD

Comprehensive guide to Air Pressure Testing


As part of the energy performance of building directive, air conditioning systems (with an output of 12kW or higher) now require an inspection and associated report.

Air conditioning units are responsible for a large proportion of the energy used in buildings. The aim of the inspections is to provide owners and occupiers with information about the systems performance and to highlight measures that will save energy, money and reduce CO2 emissions

The basics are simple...

First inspection of all existing systems over 250kw cooling capacity must be completed by 4th January 2009.

First inspection of all existing systems over 12kw must be completed by 4th January 2011.

New systems over 12kw installed after January 2008 must be inspected within 5 years of being put into service.

Each Air Conditioning Report (ACR) is valid for a maximum of 5 years.



Please enter your details to download the brochure.






request quote buttoncall us button