Project: Air Pressure Testing Rugby

Completed: 30/11/2017

Technician: Cameron Milne

The Brief

We were instructed to complete 3 Domestic Air Pressure tests on these interesting houses in Rugby

The required target for each Air Pressure test was 5

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

Target

Target

Target

Result

Result

Result

PASS

PASS

PASS

The Outcome

The property passed so certificates will be issued.