Project: Air Pressure Testing Nuneaton The Zu

Completed: 13/11/2017

Technician: Cameron Milne

The Brief

We were instructed to complete a Domestic Air Pressure and Vent Test on this property in The Zu, Nuneaton.

The required target for the Air Pressure test was 5.1

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

Target

Result

PASS

The Outcome

The property passed so certificates will be issued.

For more information on what is required to pass an Air tightness test click HERE