Project: Air Pressure Testing Bulkington CV12

Completed: 31/10/2017

Technician: Mikey Crampton 

The Brief

We were instructed to complete a Domestic Air Pressure Test on this house in Bulkington

The required target was 6

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

Target

Result

PASS

The Outcome

The property passed so certificates will be issued.