Project: Air Pressure Testing Ansty

Completed: 20/10/2017

Technician: Mikey Crampton & Cameron Milne

The Brief

We were instructed to complete two domestic Air Pressure Tests on these houses in Ansty.

The required targets were 5

The Process

After reviewing drawings, on site testing was ready to be completed. All suitable equipment was set up and checked over to ensure the best possible result.

The Result

Plot 1 Target

Plot 2 Target

Result

Result

PASS

PASS

The Outcome

The property passed so certificates will be issued.